Service areas
Pembroke, MA septic help: 150 gallons a bedroom, concrete tanks and a $10 Title 5 filing fee
An all-septic town with its own Title V rulebook, a $400 permit path, and a groundwater monitoring season that runs February through April.
Pembroke designs for 150 gallons a bedroom, not 110
Pembroke sizes a septic system at 150 gallons per day per bedroom under its Title V Rules and Regulations Exclusive to Pembroke, 36% above the 110 gallons in 310 CMR 15.203. A three-bedroom design here is a 450-gallon-a-day system, with a larger leach field and often a larger tank than across the county line.
The local rulebook, amended between 1988 and July 15, 2019, adds more. Concrete septic tanks are required unless the Board grants a variance. The reserve leaching area must sit at least 10 feet from the primary system. Setbacks run 75 feet to bordering vegetated wetlands and 100 feet to private wells. Pumping three or more times a year, or twice in 30 days, is a failure trigger, and an existing tank or cesspool must have been pumped within the two years before a building-permit application.
Two 2019 rules matter most at sale. Since May 6, 2019, a cesspool is an automatic failure when the property is conveyed, so it must be replaced with a Title 5 system when the home sells. And a Title 5 inspector must notify the Board and the Health Agent before every inspection or the report is rejected; failures are confirmed with the Health Agent present, and a conditional pass requires the repair before transfer. Pembroke is in Plymouth County, so none of the Cape’s 2023 nitrogen rules apply; MassDEP’s watershed permit table lists no Plymouth County town.
How a disposal works permit moves through 100 Center Street
The Board of Health at Town Hall, 100 Center Street, 781-709-1400, issues the Disposal Works Permit for new systems and repairs. Its step-by-step FAQ puts the typical new-system permit path at $400 in town fees: $200 to have the Health Agent witness the percolation test and $200 for plan review.
Your engineer evaluates the lot, designs to the 150-gallon standard and submits four copies of the plan, two copies of the soil analysis, the application and the $200 check; the Board has 45 days to approve or reject. Local variances go to a Board meeting, and state variances add 90 days. A town-licensed installer then picks up the approved plans and builds. Under the fee schedule effective January 1, 2019, a single-component repair with no engineering review is $100, a Title 5 report acceptance fee is $10, and a well permit is $100 to the Board plus $35 to the DPW. Confirm with the office that neither the schedule nor the rules have changed after 2019; hours were not shown on the pages we could read.
A rule of June 10, 2019 lets the Health Agent approve four administrative variances without a hearing: a one-foot reduction in groundwater separation, cellar-wall separation cut from 20 to 10 feet with a rubber membrane, footing separation cut from 10 to 5 feet if hand-dug after installation, and design flow reduced from 150 to 110 gallons per bedroom on a constrained lot. Other variances go to the Board.
Paying for a Pembroke system: the credit, MassHousing and a town program to confirm
The Cape Cod AquiFund is limited to the 15 Barnstable County towns, per the county page, so a Pembroke owner starts with the state septic credit: 60% of up to $30,000 spent repairing or replacing a failed system at a principal residence, $18,000 lifetime and $4,000 a year with a five-year carryforward. A cesspool that fails under the May 2019 conveyance rule is a documented failure for Schedule SC.
MassHousing lends up to $25,000 to owner-occupants of one- to four-family homes through participating banks, with income limits of $69,500 for the deferred loan and $139,000 for the amortized loan. Pembroke has advertised a septic betterment loan through its Treasurer/Collector of the kind the state’s Community Septic Management Program funds, but the page was not reachable and the terms are unverified, so confirm with the town whether a program is open this year. Program terms are set by the agencies and change; confirm with the state or county page linked here. The tax credit guide covers the paperwork.
Septic jobs on Pembroke’s pond and wetland lots
Full septic system replacement is the most common job, and in Pembroke it is bigger because of the 150-gallon rule. Cesspool replacement follows from the conveyance rule on older lots. A conditional pass has to be repaired before the deed transfers.
Title 5 inspections here need an inspector who knows to notify the Board first and to photograph what the town asks for; a report filed without notice is rejected. Septic design and soil evaluation is a longer process than in most towns because of the monitoring season described below. Septic tank replacement means a concrete tank, and failed Title 5 repair and upgrade work covers the single-component repairs the Board permits for $100. The Title 5 guide explains the four inspection outcomes; the inspection checklist tells you what to have ready.
Six months of well readings: high groundwater in Pembroke
Pembroke requires observation-well monitoring for at least six months before a system is designed, with readings every two weeks from February through April, the late-winter high season, and applies the Frimpter method to adjust the result to high groundwater. The Health Agent can trim the resulting separation by only one foot.
That schedule means a design started in summer may not be ready to permit until the following spring, which matters if a sale is waiting.
The reason is the ground itself: an inland town of ponds, including Furnace, Oldham, Stetson and Little Sandy Bottom, and the North River and Indian Head River wetlands, on glacial till and sand with seasonally high groundwater in the low areas. Pembroke draws its municipal water from local wells, which is why the 100-foot well separation exists. The DPW is organized into highway, water and cemetery divisions with no sewer division, the state plant list shows no municipal plant in town, and no Pembroke project sits on the 2025 or 2026 Clean Water SRF lists, so septic is the permanent plan.
To the east, Marshfield has a sewer with a one-year connection rule; to the south, Kingston has a small plant and a loan through its Collector. All 23 towns are on the service areas page.
Permits
Septic permits in Pembroke
- Office
- Town of Pembroke Board of Health
- Address
- 100 Center Street, Pembroke MA 02359 (Town Hall)
- Phone
- 781-709-1400
- Website
- www.pembroke-ma.gov/2023/Septic
Confirm hours and fees with the office before you visit; towns change them without notice.
Money
Help paying for septic work
Two public programs pay for a large share of most Title 5 upgrades. Which one applies depends on the county the house is in.
Statewide, principal residence
State income tax credit for Title 5 work
- 60% of qualifying repair or replacement costs, on up to $30,000 of expenses
- Up to $18,000 in total credit per household, taken at up to $4,000 a year
- Unused credit carries forward for up to 5 years
- Applies to the home you live in, not a rental or second home
Plymouth County homeowners
Financing for South Shore homes
- AquiFund does not extend past the Cape Cod Canal
- The Town of Plymouth runs its own Title V septic loan, repaid as a betterment on the tax bill
- MassHousing offers a septic repair loan for eligible owner-occupants statewide
- Ask your board of health which town programs are open this year
Barnstable County homeowners only
Low-interest county financing (AquiFund)
- County-run Community Septic Management Loan Program
- Interest tiers from 0% to 5%, set by the type of work and whether you live there year-round
- Repaid over up to 20 years as a betterment on your property tax bill
- Covers Title 5 repairs, replacements and nitrogen-reducing upgrades
Program terms are set by the agencies and change; confirm with the state or county page linked here before you count on a number.
Licensing
Check the credentials before you sign
Massachusetts has no single statewide septic contractor license. Two separate approvals matter. A Title 5 inspection is valid only when a System Inspector approved by MassDEP performs it. Installation and repair work is permitted town by town: each board of health licenses installers and issues the Disposal System Construction Permit for the job.
You can check both yourself. The state publishes the inspector training and approval program, and the regulation itself sets out who may do what.
Three questions to ask
-
Which of you holds the Title 5 System Inspector approval, and can I see the certificate?
Only a MassDEP-approved System Inspector may sign an official inspection form. The approval is personal to the inspector, not to the company.
-
Are you on this town’s current list of approved septic installers?
Installation licenses are issued by each board of health, one town at a time. A crew licensed in Falmouth is not automatically licensed in Bourne.
-
Who pulls the permit, and will I get the as-built plan and the Certificate of Compliance?
The permit and the final sign-off are what a future buyer’s inspector will ask for. Get it in writing that both come to you when the work closes out.
The process
From your request to a site visit
-
Your request goes to one local septic company
It goes to a single septic company that works in your town and handles your kind of job. It is not sold to a list, and you will not get calls from five companies.
-
They call to set up a site visit
Expect a call, usually within one business day. The contractor asks about the house, the inspection report if you have one, and your timing, then books a visit.
-
You get a written quote and decide
After the visit you receive a written estimate with the scope and the permit plan. There is no fee and no obligation. If it is not a fit, say so and that is the end of it.
Questions homeowners ask
How much does a septic permit cost in Pembroke?
The Board's FAQ puts a typical new-system permit path at $400 in town fees: $200 for the Health Agent to witness the percolation test and $200 for plan review of a system under 10,000 gallons a day. A single-component repair with no engineering review is $100, and the acceptance fee for a Title 5 inspection report is $10. The schedule took effect January 1, 2019; confirm with the office that it has not changed.
Why is a Pembroke septic system bigger than the same house would need in another town?
Because Pembroke designs at 150 gallons per day per bedroom, 36% above the 110 gallons in state Title 5. A three-bedroom design is 450 gallons a day here, which means a larger leach field and often a larger tank. On a constrained lot the Health Agent can approve an administrative variance down to 110 gallons per bedroom without a Board hearing, under a rule adopted June 10, 2019.
Can a cesspool pass a Title 5 inspection in Pembroke?
Not at sale. Under a rule adopted May 6, 2019, a cesspool is an automatic failure when the property is conveyed, so it must be replaced with a Title 5 system when the home sells. The state code alone fails a cesspool only on hydraulic or setback criteria. Pembroke also treats pumping three or more times a year, or twice within 30 days, as a failure trigger for any system.
Does Pembroke require concrete septic tanks?
Yes. Since July 15, 2019, concrete septic tanks are required unless the Board of Health grants a variance. Shared systems serving multi-unit developments need a 1,500-gallon tank and an effluent filter per unit. A metal tank without a 20-year Certificate of Compliance is a conditional-pass item under the state inspection form, so a tank swap in Pembroke means a concrete tank going in.
How long does the groundwater monitoring take before a Pembroke system can be designed?
At least six months. Pembroke requires observation-well monitoring read every two weeks from February through April, the late-winter high season, and applies the Frimpter method to adjust to high groundwater. The Health Agent can reduce the resulting separation by only one foot. A design started in summer may not be ready to permit until the following spring, so start early if a sale depends on it.
Can I use AquiFund in Pembroke?
No. AquiFund covers only the 15 Barnstable County towns; Pembroke is in Plymouth County. The state septic tax credit applies at a principal residence: 60% of up to $30,000 spent on a failed system, capped at $18,000 lifetime and $4,000 a year. MassHousing lends up to $25,000 through participating lenders. Pembroke has advertised a septic betterment loan through its Treasurer/Collector, but the terms were not reachable, so confirm with the town.
Tell us about your system
One call or form, a written quote after a site visit. Free for homeowners, no obligation.